How long before unapproved building work becomes legal? (The 7 year rule)

Short answer
No. There is no rule in any Australian state that makes an unapproved shed, deck, patio or extension legal once it has been standing for 7 years. The number comes from NSW, where a building information certificate stops the council ordering repairs, alterations or demolition for 7 years, but it doesn't approve the work and you have to apply for it. In Queensland and Victoria, councils use show cause notices and building notices whatever the age of the work. Unapproved work stays an issue with the property until it's sorted out, and it usually surfaces when you sell.
“It’s been there more than 7 years, so it’s legal now.” It gets said at barbecues, by sellers, and sometimes by agents. It isn’t true anywhere in Australia, and believing it can cost you real money when you sell.
Where the 7 years comes from
The number is real, it just doesn’t mean what people think. In NSW, an owner (or a buyer under contract) can apply to the council through the NSW Planning Portal for a building information certificate. Once issued, it stops the council from ordering the building to be repaired, demolished or altered for 7 years.
Three things the myth leaves out:
- You have to apply for it. Nothing happens automatically because time has passed.
- It doesn’t approve the work. The NSW Planning Portal is clear that it doesn’t make unauthorised work lawful, and it can’t be used to get an occupation certificate.
- It’s NSW only. No other state has the same certificate.
To get one, the council often asks for plans and engineering, and it may ask you to fix defects first.
Queensland: no time limit on fixing it
In Queensland, the council’s usual first step for unapproved building work is a show cause notice, giving you 20 business days to respond. If it isn’t satisfied, it can issue an enforcement notice to get the work approved, brought up to standard or removed. Councils send these for old work as well as new. The age of the structure doesn’t change whether it needed approval.
The good news: many councils close the matter once the owner gets the work approved. In Logan City Council’s fact sheet example, a shed was approved after a show cause notice and no further action was taken.
Victoria: building notices for old work too
In Victoria, the municipal building surveyor can issue a building notice to the owner, giving 30 days to show cause why the work was done without a permit, followed by a building order if needed. Again, the clock starts when the notice is issued, not when the shed went up.
South Australia: 12 months, then the court
In SA, a council can only issue an enforcement notice within 12 months of the breach. After that it has to go to the ERD Court, within 3 years unless the Attorney-General authorises later action. That limits enforcement, but it doesn’t approve the work. The details, and the shed size that never needed approval, are in can the council make you pull down an unapproved shed in SA.
When old unapproved work actually bites
Most unapproved work sits quietly for years. It usually comes up at one of these moments:
- You sell. The buyer’s building inspector or solicitor asks for approval paperwork. Buyers use the gap to negotiate the price down, and some lenders want it fixed before settlement. This is the most expensive time to deal with it.
- A neighbour complains. Often about height, overlooking or water running onto their side.
- You renovate. A certifier may not sign off new work while unapproved work sits on the same site.
- You claim on insurance for damage involving the structure.
Bought a house with unapproved work?
You inherit the problem: the obligations sit with the current owner, not whoever built it. If you’re buying, ask your conveyancer about any structure that doesn’t appear on the council’s approval records before you sign. If you already own it, the fix is the same as for any unapproved work.
How to sort it out
- Check whether it ever needed approval. Plenty of small sheds, low decks and fences never did. Our guides for sheds, decks and fences have the size and height limits.
- Gather what you have: photos, kit engineering, receipts, any plans.
- Talk to a private building certifier or your council’s building team before you list the house. They’ll tell you whether it needs approval for the existing work, changes, or engineering sign-off.
- In NSW, consider a building information certificate before selling.
- Fix real safety problems first: loose posts, missing tie-downs and decks without balustrades matter more than the paperwork.
The full process, state by state, is in what happens if you build without council approval.
Frequently asked questions
Does unapproved building work become legal after 7 years? No. No Australian state has a rule like that. Unapproved work stays unapproved until it’s approved or removed.
What is the 7 year rule in NSW? A building information certificate stops the council ordering repairs, alterations or demolition of a building for 7 years. You have to apply for it, and it doesn’t approve the work.
Can I sell a house with an unapproved shed? Yes, but the buyer’s inspection will usually find it, and it often costs you in negotiation or a rush to get it certified before settlement.
Can the council make me remove a shed the previous owner built? It can require the current owner to get it approved, fix it or remove it. That’s why it’s worth checking before you buy.
How long before an illegal building becomes legal in NSW? Never, on its own. Time doesn’t approve unauthorised work in NSW. A building information certificate stops the council ordering repairs, alterations or demolition for 7 years, but only once you’ve applied and it’s issued, and it still doesn’t make the work lawful.
Is there a 7 year rule in Victoria? Can I get a building permit after 7 years? No. Victoria has no time limit that makes unpermitted work legal. The municipal building surveyor can issue a building notice for old work as well as new, giving 30 days to show cause, then a building order if needed. Ask a building surveyor about getting the existing work assessed.
What about unapproved building work in Queensland? The age of the work doesn’t matter. Councils usually start with a show cause notice giving 20 business days to respond, then an enforcement notice to get it approved, fixed or removed.
Can the council in South Australia make me pull down an unapproved shed, and how many years before they can’t? A council can only issue an enforcement notice within 12 months of the breach. After that it has to go to the ERD Court, within 3 years unless the Attorney-General authorises later action. That limits enforcement but doesn’t approve the work. See our SA unapproved shed guide.
Can I get retrospective approval for unauthorised building work? Often, yes, though the name and the process differ by state. In NSW it’s a building information certificate. Elsewhere, talk to a private building certifier or your council’s building team about getting the existing work assessed and approved, which may need plans, engineering or changes.
Can a buyer apply for a building information certificate in NSW? Yes. An owner, or a buyer under contract, can apply to the council through the NSW Planning Portal. Buyers sometimes make it a condition of the contract.
What does the council need for a building information certificate? Often plans and engineering for the existing work, and it may ask you to fix defects before it issues the certificate. A private certifier or the council’s building team can tell you what to gather.
Sources
Every rule on this page is taken from these official sources. If a rule has changed, please tell us and we’ll fix it.
Was this guide helpful?
Thanks. If something's missing or wrong, tell us.
This guide is general information, not legal or professional advice. Rules differ between states, councils and individual properties, and they change. Confirm with your state regulator or council before starting work, and if in doubt, get a licensed tradesperson.