Can I remove a non-load-bearing wall myself in Australia?

By Thomas Horsey · Rules last checked AU

A dad and his teenage daughter standing in an older living room, looking at the hallway wall they want to open up, with the furniture pushed to one side

Short answer

Sometimes. Once a structural engineer or building surveyor has confirmed the wall carries no load and isn't bracing the house, the demolition itself is often work an owner can do, and in several states it doesn't need a building permit. Any wiring, power points or pipes in the wall must be disconnected by a licensed electrician or plumber first, and in a home built or renovated before 1990 the wall lining should be tested for asbestos before you cut into it.

Knocking out a wall between the kitchen and the living room is one of the most satisfying renovations there is. It’s also one where a wrong guess costs the most. The question isn’t really “can I swing a hammer”, it’s three questions: is the wall holding anything up, what’s inside it, and what is it made of? Get those answered first and the rest is often yours to do.

If you’re not sure, don’t start. Cracks in the ceiling, doors that stop closing or a sagging roof line can all follow the removal of a wall that turned out to be doing a job.

How do I tell if a wall is load bearing?

You can’t be sure by looking, so have a structural engineer or registered building surveyor check it before you touch it. What you can do is gather the clues they’ll ask about, which makes the visit quicker:

  • External walls are load bearing. This guide is only about internal walls.
  • Look in the roof space (safely, on the joists, with a torch). A wall is more likely to be load bearing if the ceiling joists sit on it or are joined over it, or if roof struts or a beam come down onto its top plate.
  • Direction matters, but isn’t proof. Walls running across the ceiling joists are more often load bearing than walls running the same way, but there are plenty of exceptions.
  • Check what’s above and below. A wall with another wall, a beam or a post directly above it on a second storey, or with piers or a strip footing under it in the subfloor, is likely carrying load.
  • Bracing walls may carry no roof weight at all but still stop the house racking in the wind. They’re often lined with sheet bracing behind the plasterboard, and only a professional can tell you whether one can go.

Victoria’s building rules capture the test well: the exemption from a permit only covers work that doesn’t include “the removal or alteration of any element of the building that is contributing to the support of any other element of the building”. If an engineer says the wall is doing that, you need a beam designed for it and a building approval.

Do I need approval to remove an internal wall?

A load-bearing wall needs building approval in every state. A genuinely non-load-bearing wall often doesn’t, but the rules differ:

State Non-load-bearing internal wall Load-bearing wall
NSW Minor internal alterations can be exempt development, as long as the work doesn’t alter the load-bearing capacity of the building and meets the building code Needs a complying development certificate or a development application
VIC Alterations are exempt from a building permit if they don’t affect structural soundness, don’t remove anything supporting another part of the building, and aren’t on a Heritage Register building Building permit from a registered building surveyor
QLD Councils such as Logan say a private building certifier can confirm whether approval is needed Logan lists “removal or alteration load bearing walls” as needing building approval
WA, SA, TAS, ACT, NT Check with your council or a building surveyor Assume approval is needed

Two things catch people out:

  • Heritage. Heritage-listed homes and some heritage areas have extra controls, even for internal work in some cases. Ask your council first.
  • Strata. In NSW, “changes to internal walls” are a minor renovation in a strata building. You need permission from the owners corporation, approved by a majority vote at a strata meeting, before you start. Other states have their own strata rules, so check your by-laws.

What’s inside the wall?

Most internal walls carry something. Before any demolition, find out what, because each part belongs to a licensed trade:

  • Power points, switches and cables: disconnecting, removing or moving them is electrical work, which needs a licensed electrician in every state. Queensland’s regulator names “altering the location of an existing power point” as licensed work, and Energy Safe Victoria says electrical work isn’t DIY “even for small jobs”. The electrician will make the cables safe or reroute them, and that has to happen before you cut.
  • Water and waste pipes: common in walls behind kitchens, bathrooms and laundries. Capping or rerouting them is plumbing work for a licensed plumber. In NSW, a licence is needed for any plumbing work regardless of cost.
  • Gas pipes: licensed gasfitter only.
  • Data, TV and alarm cables: have them moved before you start, so you’re not guessing which cut is safe.

Queensland’s Electrical Safety Office also warns about wiring hidden in wall cavities when cutting holes or driving screws or nails into walls. A stud finder with a live wire setting helps, but it isn’t a guarantee. Switching off at the switchboard and having the electrician confirm the wall is clear is the safe way.

Could the wall contain asbestos?

Yes, if your home was built or renovated before 1990. The national asbestos agency says a house of that age “probably has some asbestos”, and lists wall and ceiling sheeting, particularly in kitchens, bathrooms, toilets and laundries, and the backing for wall tiles and splashbacks, as common places to find it.

  • You can’t tell by looking. Have a sample tested, or treat the lining as asbestos until a test says otherwise.
  • Don’t drill, cut, sand or smash it to find out. High-speed power tools are exactly what the agency says not to use on asbestos material.
  • Removal rules differ by state. A tradie can’t remove it unless they’re licensed, or the job is under 10 m² of non-friable (bonded) asbestos and they’re trained for it. 10 m² is about one wall of an average bathroom. In the ACT, homeowners can’t remove any amount themselves. The agency recommends using a professional, and says it’s often cheaper than people expect.
  • Disposal is regulated. Asbestos waste must go to a landfill licensed to take it. Putting it in your household bin can mean a fine.

If the lining is plasterboard on timber studs and the test is clear, the demolition is much simpler.

What you can do yourself, and when to call a licensed trade

Once the wall is confirmed non-load-bearing, any approval is sorted, the services are disconnected and the asbestos test is clear, a lot of the job is usually yours.

Usually yours to do:

  • Clear the room, cover the floor and seal doorways with plastic to keep dust in.
  • Remove skirting, architraves and cornice along the wall.
  • Take off the plasterboard linings and pull out the timber studs and plates.
  • Patch the ceiling and walls where the old wall met them. Our plasterboard patching guide covers the small holes.
  • Fill the gap in the flooring. There’s often no floor covering under an old wall, so plan for it.
  • Paint, and put new skirting and cornice in.

Call a licensed or registered professional for:

  • Deciding whether the wall is load bearing: a structural engineer or building surveyor.
  • Any approval: a building surveyor or certifier, or your council.
  • Power points, switches, lights and cables in the wall: a licensed electrician.
  • Water, waste or gas pipes: a licensed plumber or gasfitter.
  • Testing or removing suspected asbestos: an asbestos assessor and a licensed removalist.
  • A replacement beam if the wall turns out to be load bearing: engineer-designed, built under approval.

Owner-builder thresholds, if it’s part of a bigger renovation

Taking out one wall rarely reaches these limits. A whole kitchen and living renovation can, and above them you need an owner-builder permit to manage the building work yourself:

  • NSW: renovation work valued at over $10,000 needs an owner-builder permit, and over $20,000 you also need to complete certain units of competency.
  • Queensland: a permit is needed for a building project valued at more than $11,000. The QBCC says owner-builders still can’t do occupational work such as plumbing, draining or gasfitting without the matching licence.
  • Victoria: a certificate of consent from the Building and Plumbing Commission is needed before carrying out domestic building work over $20,000.
  • Western Australia: owner-builder approval may be needed where a building permit is required and the work is worth more than $20,000.
  • SA, Tasmania, ACT and NT: check with your state’s building regulator.

An owner-builder permit is about managing building work. It never lets you do your own electrical work, and in Queensland the QBCC is clear that plumbing and gasfitting still need the licence.

Patching the ceiling and walls afterwards? The free plasterboard calculator gives the sheets, screws, joint tape and cornice you need.

Frequently asked questions

Can I remove a stud wall without council approval? Often, if it’s confirmed non-load-bearing and your state’s exemption applies, as in the NSW and Victorian rules above. Confirm it with a building surveyor or your council first, especially for a heritage-listed home or a strata unit.

How much of a wall can I remove before it needs an engineer? There’s no safe size. Even a short section of a load-bearing wall needs a properly designed beam. The question is what the wall does, not how much of it goes.

Can I just cut the plasterboard to look inside? Only once you’re sure it isn’t asbestos sheeting and there’s no wiring where you’re cutting. In a pre-1990 home, have the lining tested first, and switch the power off at the switchboard before cutting.

Who moves the power point that’s on the wall? A licensed electrician. Removing or relocating a power point is licensed electrical work everywhere in Australia, and it needs doing before the wall comes down.

What happens if I remove a load-bearing wall without approval? Beyond the structural risk, unapproved building work can cause problems with your council, your insurer and a future sale. See what happens if you build without council approval.

How do I tell if a wall is load bearing? You can’t be sure by looking, so have a structural engineer or building surveyor check it. Clues they’ll ask about: ceiling joists resting or joined on top of it, roof struts or a beam coming down onto it, a wall or post directly above it, or piers or a footing under it.

Do I need a permit to remove a non-load-bearing wall? Often not. In NSW minor internal alterations can be exempt development if they don’t change the building’s load-bearing capacity. Victoria exempts alterations that don’t affect structural soundness, except on Heritage Register buildings. In Queensland, a private certifier can confirm. Elsewhere, ask your council or a building surveyor.

What is a bracing wall? A wall that may carry no roof weight but stops the house racking sideways in the wind. They’re often lined with sheet bracing behind the plasterboard, and only a professional can say whether one can be removed.

Do I need strata approval to remove a wall? In NSW, yes. Changes to internal walls are a minor renovation that needs the owners corporation’s approval by majority vote at a strata meeting before you start. Check your by-laws in other states.

How do I get rid of asbestos wall sheeting? Have it tested first. A tradie needs an asbestos removal licence unless the job is under 10 m² of bonded asbestos and they’re trained for it, and in the ACT homeowners can’t remove any amount themselves. The waste must go to a landfill licensed to take it, never the household bin.

Does an owner-builder permit let me do the electrical and plumbing? No. An owner-builder permit covers managing building work. Electrical work always needs a licensed electrician, and in Queensland the QBCC says plumbing, drainage and gasfitting still need the matching licence.

Sources

Every rule on this page is taken from these official sources. If a rule has changed, please tell us and we’ll fix it.

  1. Building and Plumbing Commission, Owner-builder eligibility
  2. Victorian Building Authority, Practice Note BP 01: When is a building permit required (2023, Greater Dandenong copy)
  3. NSW Department of Planning, Remedial building work and the Codes SEPP fact sheet
  4. Logan City Council (QLD), Building approval requirements: domestic
  5. Asbestos and Silica Safety and Eradication Agency, Householders and home renovators
  6. Queensland Electrical Safety Office, Don't do your own electrical work
  7. Energy Safe Victoria, Electrical DDIY (don't do it yourself)
  8. NSW Government, Plumbing, draining and gasfitting licences
  9. NSW Government, Strata renovation rules
  10. NSW Government, How to apply for an owner-builder permit
  11. QBCC, About owner-building
  12. Consumer Affairs Victoria, Owner builders
  13. WA Government, Owner-builder approval

Was this guide helpful?

This guide is general information, not legal or professional advice. Rules differ between states, councils and individual properties, and they change. Confirm with your state regulator or council before starting work, and if in doubt, get a licensed tradesperson.