What electrical work can I do myself in the UK? Part P explained

Short answer
In England you can do a lot yourself: replacing sockets, switches, ceiling roses and light fittings, and adding a light point or socket to an existing circuit outside a bathroom, don't need to be notified. Three things are notifiable under Part P: installing a new circuit, replacing a consumer unit, and adding to or altering a circuit in a special location such as a room with a bath or shower. All work, notifiable or not, must still be done safely and to the regulations.
The UK is far more relaxed than Australia about DIY electrics, but “allowed to do it” and “allowed to do it without telling anyone” are different things. Part P of the Building Regulations (England) is about the second.
Non-notifiable: you can do it yourself
Most minor work in England doesn’t need to be notified to building control. That includes:
- replacing sockets, switches and ceiling roses
- replacing light fittings
- replacing a damaged cable on a single circuit
- adding a light point or socket to an existing circuit, outside a special location
- maintenance, replacement and repair work generally
Non-notifiable doesn’t mean unregulated. The work still has to be done safely and meet the wiring regulations, so if you’re not confident, get an electrician.
Notifiable: must be certified
Under Part P, three kinds of work must be notified:
| Work | Why |
|---|---|
| Installing a new circuit (for example, a new circuit for an electric shower or EV charger) | Changes the load and protection on the installation |
| Replacing a consumer unit (fuse box) | Affects every circuit in the house |
| Adding to or altering a circuit in a special location | Water and electricity together, rooms with a bath or shower, swimming pools and saunas |
In a bathroom, the special location runs from the floor up to 2.25 m high and out 0.6 m from the edge of the bath or shower tray (or 1.2 m from the centre of the shower head).
How notification works
There are three routes:
- Use an electrician registered with a competent person scheme. They certify their own work and notify building control for you. This is the usual option.
- Use an electrician who works with a registered third-party certifier.
- Do it yourself and apply to building control first. Submit a building notice to your local authority before you start and pay the fee; they’ll inspect the work.
Not notifying notifiable work is an offence, and the council can require you to remove or alter work that doesn’t comply. It can also cause problems when you sell, since buyers’ solicitors ask for electrical certificates.
Wales and Scotland
- Wales has had its own version of Part P since 2014, with a wider scope, check the current Welsh rules before assuming the English list applies.
- Scotland doesn’t use Part P. Some electrical work needs a building warrant under the Building Standards system, and certification works differently. Check with your council.
Compared with Australia
In every Australian state, even replacing a socket (a “power point”) is licensed work for an electrician, see what you can legally DIY in Australia. If you’re following UK DIY videos from Australia, the rules don’t carry over.
Frequently asked questions
What is Part P? Part P of the Building Regulations covers electrical safety in homes in England. It sets out which electrical work is notifiable, meaning it has to be certified or inspected, and requires all electrical work to be done safely, whoever does it.
What electrical work is notifiable under Part P? Three kinds: installing a new circuit, replacing a consumer unit (fuse box), and adding to or altering a circuit in a special location, such as a room with a bath or shower.
Can I replace a socket myself in the UK? Yes, in England. Replacing sockets, switches, ceiling roses and light fittings isn’t notifiable, though the work must still meet the wiring regulations. Get an electrician if you’re not confident.
Can I add a socket to an existing circuit myself? In England, yes, as long as it’s outside a special location like a bathroom. Adding to a circuit within the bathroom zone is notifiable.
What counts as a special location in a bathroom? From the floor up to 2.25 m high, and out 0.6 m from the edge of the bath or shower tray, or 1.2 m from the centre of the shower head.
How do I get a Part P certificate? Use an electrician registered with a competent person scheme, who certifies the work and notifies building control for you. Alternatively, use an electrician who works with a registered third-party certifier, or submit a building notice to your council before you start and have them inspect.
Can I replace my own consumer unit? It’s notifiable. Either a registered electrician does it and notifies building control, or you submit a building notice and pay the fee before starting so the council can inspect. Most people use a registered electrician.
What happens if I don’t notify notifiable electrical work? It’s an offence, and the council can require you to remove or alter work that doesn’t comply. It also causes problems when you sell, because buyers’ solicitors ask for electrical certificates.
Does Part P apply in Wales and Scotland? Wales has had its own version since 2014, with a wider scope, so check the Welsh rules. Scotland doesn’t use Part P: some electrical work needs a building warrant under its Building Standards system.
Sources
Every rule on this page is taken from these official sources. If a rule has changed, please tell us and we’ll fix it.
Was this guide helpful?
Thanks. If something's missing or wrong, tell us.
This guide is general information, not legal or professional advice. Rules differ between states, councils and individual properties, and they change. Confirm with your state regulator or council before starting work, and if in doubt, get a licensed tradesperson.